• /wordpress/wp-content/uploads/Mt.-TaborWashington-Park-Interim-Security-and-Deferred-Maintenance-Project--600x300.jpg
  • /wordpress/wp-content/uploads/Mt.-TaborWashington-Park-Interim-Security-and-Deferred-Maintenance-Project-451-600x300.jpg
  • /wordpress/wp-content/uploads/Mt.-TaborWashington-Park-Interim-Security-and-Deferred-Maintenance-Project-DSCF4266-600x300.jpg
  • /wordpress/wp-content/uploads/Mt.-TaborWashington-Park-Interim-Security-and-Deferred-Maintenance-Project-tie-ins-600x300.jpg
  • /wordpress/wp-content/uploads/Mt.-TaborWashington-Park-Interim-Security-and-Deferred-Maintenance-Project--600x300.jpg
  • /wordpress/wp-content/uploads/Mt.-TaborWashington-Park-Interim-Security-and-Deferred-Maintenance-Project-451-600x300.jpg
  • /wordpress/wp-content/uploads/Mt.-TaborWashington-Park-Interim-Security-and-Deferred-Maintenance-Project-DSCF4266-600x300.jpg
  • /wordpress/wp-content/uploads/Mt.-TaborWashington-Park-Interim-Security-and-Deferred-Maintenance-Project-tie-ins-600x300.jpg

Mt. Tabor / Washington Park Interim Security and Deferred Maintenance Project

This CM/GC project for the City of Portland enhanced security and implemented water delivery improvements on the turn-of-the-century historical reservoirs. Work included extensive attention to environmental surroundings, preservation of historically designated work components, 2000+ feet of new sewer mains that included diversion of flow with new manholes and inlet installation, 5000+ feet of 24”-54” steel pipe water mains, which included valves and vaults, new upgrades to electrical and security, existing building improvements, and ongoing communication with the public. Typical CM/GC construction had civil work commencing prior to the completion of seismic and security systems design.

Total Project Value: $22.7 million

Slayden Construction Role: Construction Manager/General Contractor

Owner: City of Portland, Water Bureau